The understanding of the role and intent of the Planning Phase in the Project Cycle has helped you to better understand the importance of the Design Phase of construction projects. Provide a written assignment covering your review through the use of journal articles of the following:
i. the importance of construction documentation in any three (3) project delivery methods familiar or in use in Jamaica. (35 marks)
Design Build
Design Bid build
Construction Management at Risk (CMR)
OR
Traditional design – tender -bid
ii. the gaps and weaknesses of contract documents in the administration of construction projects that have used the FIDIC form. (35 marks)
iii. the central role of specifications in achieving the stated objectives of a project. (35 marks)
https://doi.org/10.1108/17260531211211863
https://doi.org/10.1108/ECAM-05-2022-0455
https://doi.org/10.1108/IJBPA-11-2022-0176
https://doi.org/10.1108/ijbpa-11-2022-0176
these journal articles could be used for section 3
NOTE – A JOURNAL ARTICLE MUST BE PEER REVIEWED
Posted inUncategorized