Certificate in Mechanical & Plumbing Systems

This assignment is about a case study of a 5-story Wafer Fabrication Plant. The WFP is located 20m above mean sea level. Each story is 4m high.

3rd floor: Assuming cleanroom areas are Bay 7 to 10 where test tools/devices are installed as shown in Figure 1. The area enclosed in the bigger red box has a floor area of about 750 m2. The toilets are enclosed in a smaller red box. Apart from these areas, you do not need to consider other parts of the 3rd floor in this case study.

4th-floor office: As indicated in Figure 2, this level consists of open-plan office cubicles and small office rooms. The floor area is about 750 m2. There is approximately 90 staff working in the area enclosed in the red box.

Comments are closed.