Company ABC is converting an existing 6m high building (2 storey) into a high-value asset depository center: Physical security Assignment, TP

Introduction to Security — E-Learning (Asynchronous Tutorial) No. 1

Company ABC is converting an existing 6m high building (2 storey) into a high-value asset depository center. 2 storey buildings are located on the left and right side of the facility.

The appointed Architect has re-designed the building layout & landscape based on the Client’s input.

The facility is provided with a 2.4m welded mesh fence, 1 double vehicular gate (chain link fence fabric) and 1 single rigid steel bar pedestrian gate.

1. Briefly describe the total security design (4 elements) approach taken for the above facility (refer to Figure 1). The approach should be based on the Protection in Depth approach. Only Adjacent & Perimeter Protection be considered.

1. What are the physical conditions affecting the proposed design? (Note: You are also to indicate all the proposed measures with appropriate legends in the Figure 1 provided.)

Stuck with a lot of homework assignments and feeling stressed ?
Take professional academic assistance & Get 100% Plagiarism free papers
Get A Free Quote

The post Company ABC is converting an existing 6m high building (2 storey) into a high-value asset depository center: Physical security Assignment, TP appeared first on Singapore Assignment Help.