FMT309 After having taken over from the developer the management and maintenance: Building Diagnostics Assignment, SUSS

Question 2

After having taken over from the developer the management and maintenance of the common property of a strata-titled residential development, the management council of the Management Corporation received several feedback from residents on defective floor tiles.

The residents presented a petition to the management council to follow up with the developer on the following FOUR (4) defects:
• Spalled concrete soffit at the kitchen areas
• Efflorescence on the bathroom homogenous wall tiles
• Lippages on the living floor porcelain tiles
• Warped timber floor strips in the bedroom

(a) Discuss the probable cause(s) of these reported defects.

(b) Recommend appropriate solutions for repair or replacement of these defects.

Buy Custom Answer of This Assessment & Raise Your Grades
Get A Free Quote

The post FMT309 After having taken over from the developer the management and maintenance: Building Diagnostics Assignment, SUSS appeared first on Singapore Assignment Help.