BLDG 9192
ME-I Assignment # 1 Plumbing Systems
Outline
For this assignment you must follow the Scope of Work section, regarding the Plumbing systems for the “RENOVATIONS IN WASHROOM 293. NEW UNIVERSAL WASHROOM”.
The purpose of the Assignment #1 is to check the students’ understanding of Plumbing Systems by surveying the components quantities, using plumbing drawings.
The information necessary to complete the Assignment # 1 can be found in the Mechanical/Plumbing Drawings set posted on the Brightspace. In addition, the information about plumbing systems quantity surveying provided in Lectures # 2 & 3, should be considered.
SCOPE OF WORK
Scope of work include the takeoff/quantities surveying of materials and plumbing fixtures required to provide a complete installation of plumbing systems shown on the drawings.
This is an individual Assignment.
Clearly indicate on the uploaded files the student’s name, student ID and CRN.
Due Date:
The soft copy of the assignment will include the Bluebeam with markups list file (pdf) and the Excel spreadsheet file (xls.) must be uploaded in Brightspace by the end of Week # 6 (end of ME-I course.
Evaluation
This assignment represents 15% of the final grade for BLDG 9192.
EVALUATION CRITERIA:
50 points for a complete – markups list which must include the following columns:
- Subject – 10 points
- Length – 15 points
- Count – 15 points
- Measurement – Color and Layer – 5 points
- Rise/drop – 5 points
50 points for a complete – quantity surveying/take-off spreadsheet which must include the following system components:
- Domestic Water distribution: cold & hot water new (marked with N in the drawings) ½” piping, fittings, valves, 20 points
- sanitary new 4”, 1” piping and fittings, floor drain, 15 points
- sanitary venting 3” piping and fittings, 10 points
- plumbing fixtures, 5 points
Total: 100
Available Drawings: M-1 Plumbing, scale ¼” – 1’; M-2 Plumbing Diagram, as shown NTS
Floor Elevation: 10 feet
Ceiling Plenum Elevation: 2 feet
ME-I Assignment # 2 HVAC- System
Outline
For this assignment you must follow the Scope of Work section, regarding the HVAC-Ductwork system for the “NEW TEACHING LAB”.
The purpose of Assignment 2 is to check the students’ understanding of HVAC ducted systems by surveying the components quantities, using HVAC drawings.
The information necessary to complete Assignment 2 can be found in the Mechanical/HVAC Drawings set posted on Brightspace. In addition, the information about mechanical ventilation systems quantity surveying provided in Lecture # 4 should be considered.
SCOPE OF WORK
Scope of work includes the takeoff/quantities surveying of HVAC materials and components required to provide a complete installation of HVAC-ducted system shown on the drawings.
This is an individual Assignment.
Clearly indicate on the uploaded files the student’s name, student ID and CRN.
Due Date:
The soft copy of the assignment will include the Bluebeam with markups list file (pdf) and the Excel spreadsheet file (xls.) must be uploaded in Brightspace on Week # 6.
Evaluation
This assignment represents 20% of the final grade for BLDG 9192.
EVALUATION CRITERIA:
50 points for a complete – markups list which must include the following columns:
- Subject, Page Index – 10 points
- Length – 15 points
- Count – 15 points
- Measurement – Color and Layer – 5 points
- Rise/drop – 5 points
50 points for a complete – quantity surveying spreadsheet which must include the following system components:
- New Ductwork (marked with N in the drawings), supply and return/exhaust, 25 points
- New Terminal equipment, VAV, supply air diffusers, 10 points
- New AC system, 10 points
- New grilles, balancing dampers, 5 points
Total: 100
Available Drawings: M-1 HVAC Lab Plan; M-2 HVAC Roof Plan, Scale ¼”= 1’-0”; M-3 Notes & Specifications
ME-I Assignment # 3 Plumbing & HVAC Unit Price Cost Estimate
Outline
For this assignment you must use the completed Assignments # 1 & 2 take-offs
SCOPE OF WORK
The scope of work is to use the provided spreadsheet templates, which contain material and labor costs from the RSMeans cost database, to build the project’s cost estimate for the plumbing and HVAC work take-offs performed in Assignments #1 and #2.
This is an individual Assignment.
Clearly indicate on the uploaded files the student’s name, student ID and CRN.
Due Date:
The soft copy of the assignment will include the Excel spreadsheet file (xls.) must be uploaded in Brightspace on Week # 6.
Evaluation
This assignment represents 15% of the final grade for BLDG 9192.
EVALUATION CRITERIA:
- The base cost estimates shall be performed in accordance with the items included in the spreadsheet.
- According to your experience, please include or subtract (add or leave blank line items, as appropriate) and comment on your decision on the specific line
NOTE: On the HVAC spreadsheet, use the following straight duct conversion for rectangular fittings:
- Rectangular to round take off transition: 4 ft
- Rectangular 90 Deg. Elbow: 3 ft
- Rectangular side transition: 3 ft